Difference between revisions of "MVWT Meeting 2004-06-17"

From Murray Wiki
Jump to navigationJump to search
m
 
(4 intermediate revisions by 2 users not shown)
Line 16: Line 16:
#* Plans for research and competition
#* Plans for research and competition


Links
Documents
# Positioning Team GOTChA
# [http://www.cds.caltech.edu/~demetri/MVWTII_Pos_GOTChA_061704.ppt Positioning GOTChA for 06-17-04 meeting]
# Vehicle Team GOTChA for 06-17-04 meeting [[Media:GOTChA_Vehicle.ppt]]
 
Items and Comments from Meeting
# Vehicle Team
#* GOTChA chart needs to have more specific objectives, with timetables and quantitative requirements.
#* The deadline should be in the objectives.
#* The approach needs to directly address the technical challenges
# Positioning Team
#* Timing is the major issue
#** Need a solution for the roof by Aug. 15
#** Need to maintain current vision capabilities in time for first competition.
#* Need to deal with other teams and scheduling--if the vision system doesn't work, hard for others to test.
#* It's most likely that the RFID system won't work quickly, so it's important to get the vision system up to full capability soon.
# C2 Team
#* We need a 2nd, non-Roboflag command and control system.
#* Include quantitative objectives--how many vehicles to handle, what speed for data logging, etc.
# General Action Items
#* Update colored arrows in charts, changes in GOTChA charts should be in blue.
#* Each team needs a block diagram, with each person doing some block of jobs.
# For Next Week:
#* Each team needs both charts
#* Each team should have a weekly regular meeting time.
#* Talk with coordinators about timelines.

Latest revision as of 00:32, 21 June 2004

Weekly Project Meeting, 17 Jun 04

Goals and Agenda

Goals

  • Discuss draft plans from each of the subteams
  • Talk about status of RoboFlag infrastructure

Agenda

  1. Goals, agenda and notetaker
  2. Subteam reports: vehicle, positioning, C2
    • Present draft GOTChA chart (5 min each)
    • Discussion (5 min each)
  3. RoboFlag discussion
    • Status of simulation, code, etc
    • Plans for research and competition

Documents

  1. Positioning GOTChA for 06-17-04 meeting
  2. Vehicle Team GOTChA for 06-17-04 meeting Media:GOTChA_Vehicle.ppt

Items and Comments from Meeting

  1. Vehicle Team
    • GOTChA chart needs to have more specific objectives, with timetables and quantitative requirements.
    • The deadline should be in the objectives.
    • The approach needs to directly address the technical challenges
  2. Positioning Team
    • Timing is the major issue
      • Need a solution for the roof by Aug. 15
      • Need to maintain current vision capabilities in time for first competition.
    • Need to deal with other teams and scheduling--if the vision system doesn't work, hard for others to test.
    • It's most likely that the RFID system won't work quickly, so it's important to get the vision system up to full capability soon.
  3. C2 Team
    • We need a 2nd, non-Roboflag command and control system.
    • Include quantitative objectives--how many vehicles to handle, what speed for data logging, etc.
  4. General Action Items
    • Update colored arrows in charts, changes in GOTChA charts should be in blue.
    • Each team needs a block diagram, with each person doing some block of jobs.
  5. For Next Week:
    • Each team needs both charts
    • Each team should have a weekly regular meeting time.
    • Talk with coordinators about timelines.