Difference between revisions of "CDS 101/110a, Fall 2006 - Course Schedule"
From Murray Wiki
Jump to navigationJump to search
Line 1: | Line 1: | ||
{| border=1 width=100% | {| border=1 width=100% | ||
|- | |- | ||
Line 47: | Line 44: | ||
|- | |- | ||
| 9 Oct (M) | | 9 Oct (M) | ||
| Qualitative Analysis and Stability | |||
| [[AM:Dynamic Behavior|AM 4.1-4.2]] | | [[AM:Dynamic Behavior|AM 4.1-4.2]] | ||
| rowspan=3 align=center | {{cds101 homework|3}} | | rowspan=3 align=center | {{cds101 homework|3}} | ||
|- | |- | ||
| 11 Oct (W) | | 11 Oct (W) | ||
| Stability Analysis | |||
| [[AM:Dynamic Behavior|AM 4.3]] | | [[AM:Dynamic Behavior|AM 4.3]] | ||
|- | |- | ||
| 13 Oct (F) | | 13 Oct (F) | ||
| Lyapunov Stability (CDS 110) | |||
| [[AM:Dynamic Behavior|AM 4.3]] | | [[AM:Dynamic Behavior|AM 4.3]] | ||
|- | |- | ||
Line 65: | Line 62: | ||
|- | |- | ||
| 16 Oct (M) | | 16 Oct (M) | ||
| Linear Time-Invariant Systems | |||
| [[AM:Linear Systems|AM 5.1-5.2]] | | [[AM:Linear Systems|AM 5.1-5.2]] | ||
| rowspan=3 align=center | {{cds101 homework|4}} | | rowspan=3 align=center | {{cds101 homework|4}} | ||
|- | |- | ||
| 18 Oct (W) | | 18 Oct (W) | ||
| Linear System Properties | |||
| [[AM:Linear Systems|AM 5.3-5.4]] | | [[AM:Linear Systems|AM 5.3-5.4]] | ||
|- | |- | ||
| 20 Oct* (F) | | 20 Oct* (F) | ||
| Performance Measures | |||
| [[AM:Linear Systems|AM 5.4-5.5]] | | [[AM:Linear Systems|AM 5.4-5.5]] | ||
|- | |- | ||
Line 83: | Line 80: | ||
|- | |- | ||
| 23 Oct (M) | | 23 Oct (M) | ||
| Reachability and State Feedback | |||
| [[AM:State Feedback|AM 6.1-6.3]] | | [[AM:State Feedback|AM 6.1-6.3]] | ||
| rowspan=3 align=center | {{cds101 exam|Midterm}} | | rowspan=3 align=center | {{cds101 exam|Midterm}} | ||
|- | |- | ||
| 25 Oct (W) | | 25 Oct (W) | ||
| Eigenvalue Placement | |||
| [[AM:State Feedback|AM 6.4-6.5]] | | [[AM:State Feedback|AM 6.4-6.5]] | ||
|- | |- | ||
| 27 Oct (F) | | 27 Oct (F) | ||
| Midterm review (Dunlop) | | {{cds101 lecture|Midterm review}} (Dunlop) | ||
| | | | ||
|- | |- | ||
Line 101: | Line 98: | ||
|- | |- | ||
| 30 Oct (M) | | 30 Oct (M) | ||
| Transfer Functions | |||
| [[AM:Transfer Funtions|AM 8.1-8.3]] | | [[AM:Transfer Funtions|AM 8.1-8.3]] | ||
| rowspan=3 align=center | {{cds101 homework|5}} | | rowspan=3 align=center | {{cds101 homework|5}} | ||
|- | |- | ||
| 1 Nov (W) | | 1 Nov (W) | ||
| Laplace Transforms | |||
| [[AM:Transfer Functions|AM 8.6]] | | [[AM:Transfer Functions|AM 8.6]] | ||
|- | |- | ||
| 3 Nov (F) | | 3 Nov (F) | ||
| Bode Plots | |||
| [[AM:Transfer Functions|AM 8.4-8.5]] | | [[AM:Transfer Functions|AM 8.4-8.5]] | ||
|- | |- | ||
Line 119: | Line 116: | ||
|- | |- | ||
| 6 Nov (M) | | 6 Nov (M) | ||
| Nyquist Stability Criterion | |||
| [[AM:Loop Analysis|AM 9.1-9.2]] | | [[AM:Loop Analysis|AM 9.1-9.2]] | ||
| rowspan=3 align=center | {{cds101 homework|6}} | | rowspan=3 align=center | {{cds101 homework|6}} | ||
|- | |- | ||
| 8 Nov (W) | | 8 Nov (W) | ||
| Stability Margins | |||
| [[AM:Loop Analysis|AM 9.3-9.4]] | | [[AM:Loop Analysis|AM 9.3-9.4]] | ||
|- | |- | ||
| 10 Nov* (F) | | 10 Nov* (F) | ||
| System Gain (CDS 110) | |||
| [[AM:Loop Analysis|AM 9.5]] | | [[AM:Loop Analysis|AM 9.5]] | ||
|- | |- | ||
Line 137: | Line 134: | ||
|- | |- | ||
| 13 Nov (M) | | 13 Nov (M) | ||
| The PID Controller | |||
| [[AM:PID Control|AM 10.1-10.2]] | | [[AM:PID Control|AM 10.1-10.2]] | ||
| rowspan=3 align=center | {{cds101 homework|7}} | | rowspan=3 align=center | {{cds101 homework|7}} | ||
|- | |- | ||
| 15 Nov (W) | | 15 Nov (W) | ||
| PID Control Design | |||
| [[AM:PID Control|AM 10.3]] | | [[AM:PID Control|AM 10.3]] | ||
|- | |- | ||
| 17 Nov (F) | | 17 Nov (F) | ||
| PID Implementation | |||
| [[AM:PID Control|AM 10.4-10.5]] | | [[AM:PID Control|AM 10.4-10.5]] | ||
|- | |- | ||
Line 155: | Line 152: | ||
|- | |- | ||
| 20 Nov (M) | | 20 Nov (M) | ||
| Control Design using Loop Shaping | |||
| [[AM:Loop Shaping|AM 11.1-11.4]] | | [[AM:Loop Shaping|AM 11.1-11.4]] | ||
| rowspan=3 align=center | {{cds101 homework|8}} | | rowspan=3 align=center | {{cds101 homework|8}} | ||
|- | |- | ||
| 22 Nov (W) | | 22 Nov (W) | ||
| Limits of Performance | |||
| [[AM:Loop Shaping|AM 11.5]] | | [[AM:Loop Shaping|AM 11.5]] | ||
|- | |- | ||
Line 173: | Line 170: | ||
|- | |- | ||
| 27 Nov (M) | | 27 Nov (M) | ||
| Modeling Uncertainty | |||
| [[AM:Robust Performance|AM 12.1-12.2]] | | [[AM:Robust Performance|AM 12.1-12.2]] | ||
| rowspan=3 align=center | {{cds101 exam|Final}} | | rowspan=3 align=center | {{cds101 exam|Final}} | ||
|- | |- | ||
| 29 Nov (W) | | 29 Nov (W) | ||
| Robust Performance | |||
| [[AM:Robust Performance|AM 12.3-12.5]] | | [[AM:Robust Performance|AM 12.3-12.5]] | ||
|- | |- | ||
| 1 Dec* (F) | | 1 Dec* (F) | ||
| Final review | | {{cds101 lecture|Final review}} | ||
| | | | ||
|} | |} |
Revision as of 03:44, 1 October 2006
Week | Date | Topic | Reading | Homework |
1 |
Introduction to Feedback and Control |
|||
25 Sep (M) | Introduction to Feedback | AM 1.1-1.4 | HW #1 | |
27 Sep (W) | Introduction to Control | AM 1.5-1.6 | ||
29 Sep* (F) | MATLAB Tutorial (Elisa Franco) | |||
2 |
System Modeling | |||
2 Oct (M) | Introduction to Modeling | AM 2.1--2.3 | HW #2 | |
4 Oct* (W) | Modeling using Ordinary Differential Equations | AM 2.4, AM 3.x | ||
6 Oct* (F) | Review of Linear Algebra and ODEs | |||
3 |
Dynamic Behavior | |||
9 Oct (M) | Qualitative Analysis and Stability | AM 4.1-4.2 | HW #3 | |
11 Oct (W) | Stability Analysis | AM 4.3 | ||
13 Oct (F) | Lyapunov Stability (CDS 110) | AM 4.3 | ||
4 |
Linear Systems | |||
16 Oct (M) | Linear Time-Invariant Systems | AM 5.1-5.2 | HW #4 | |
18 Oct (W) | Linear System Properties | AM 5.3-5.4 | ||
20 Oct* (F) | Performance Measures | AM 5.4-5.5 | ||
5 |
State Feedback | |||
23 Oct (M) | Reachability and State Feedback | AM 6.1-6.3 | Midterm | |
25 Oct (W) | Eigenvalue Placement | AM 6.4-6.5 | ||
27 Oct (F) | Midterm review (Dunlop) | |||
6 |
Transfer Functions | |||
30 Oct (M) | Transfer Functions | AM 8.1-8.3 | HW #5 | |
1 Nov (W) | Laplace Transforms | AM 8.6 | ||
3 Nov (F) | Bode Plots | AM 8.4-8.5 | ||
7 |
Loop Analysis | |||
6 Nov (M) | Nyquist Stability Criterion | AM 9.1-9.2 | HW #6 | |
8 Nov (W) | Stability Margins | AM 9.3-9.4 | ||
10 Nov* (F) | System Gain (CDS 110) | AM 9.5 | ||
8 |
PID Control | |||
13 Nov (M) | The PID Controller | AM 10.1-10.2 | HW #7 | |
15 Nov (W) | PID Control Design | AM 10.3 | ||
17 Nov (F) | PID Implementation | AM 10.4-10.5 | ||
9 |
Loop Shaping | |||
20 Nov (M) | Control Design using Loop Shaping | AM 11.1-11.4 | HW #8 | |
22 Nov (W) | Limits of Performance | AM 11.5 | ||
24 Nov (F) | No class (Thanksgiving) | |||
10 |
Robust Performance | |||
27 Nov (M) | Modeling Uncertainty | AM 12.1-12.2 | Final | |
29 Nov (W) | Robust Performance | AM 12.3-12.5 | ||
1 Dec* (F) | Final review |