Fall 2010

Project GOTChA chart

Goals

  • Design development: work out a clear, coordinated description of all aspects of the design, including architectural, mechanical, electrical, plumbing, and fire protection systems (due 23 Nov 2010).
  • Provide support and input as needed for virtual house tour and physical model (SCI-Arc lead; due 7 Jan 2011)

Technical Challenges

  • Bring new team members up to speed quickly
  • Baseline designs for some subsystems not yet in place
  • Integration of SCI-Arc and Caltech activities

Objectives

  • Refine baseline specifications to insure maximum points in competition
    • Provide full capability with net-zero energy consumption for 80th percentile day
    • Provide zero-net energy consumption with reduced capability on worst case day
  • Establish detailed cost and performance metrics for each subsystem
    • Establish performance specifications for each team/subsystem, tied to competition rules
    • Determine cost targets for each team/subsystem to hit $250K target
  • Develop performance models demonstrating that specifications can be met
  • Document all components on team wiki + project manual

Approach

  • Stick to summer 2010 system architecture decisions
  • Use CS/EE/ME 75 course structure to clock progress

Course schedule

Week Date Topic Reading/Activities Homework
1
27 Sep (M) Organizational meeting
  • Reed: Solar Decathlon overview [15 min]
  • Fei: Baseline overview [15 min]
  • Richard: CS/EE/ME 75 organization [20 min]
  • Q&A [5 min]
Submit team preference and scheduling sheets; read SD rules HW #1: SD competition rules + wiki account creation
2
4 Oct (M) Project schedule
  • Overall SD schedule [Reed]
  • SCI-Arc/Caltech master schedule for fall [Reed]
  • GOTChA charts [Richard]
  • Milestone "party" (9 Oct?)

Team meetings start. Joint scheduling event with Sci-Arc on 9 Oct (?)

HW #2: Team schedules, subsystem GOTChAs
3
11 Oct (M)* System specifications
  • Baseline specifications [Fei]
  • Documentation format [Reed]
HW #3: Project specifications
4
18 Oct (M) System modeling HW #4: Baseline model and analysis
5
25 Oct (M)* Design review process Design reviews (midterms)
6
1 Nov (M) Team presentation
7
8 Nov (M)* Team presentation
8
15 Nov (M)* Team presentation Design review
9
22 Nov (M) Project review Building information model, design drawings and project manual due
10
29 Nov (M) Lessons learned and plans for second term Project documentation due (end of finals)