User:Murray: Difference between revisions

From Murray Wiki
Jump to navigationJump to search
No edit summary
(added notes section)
Line 46: Line 46:
</table>
</table>


== Notes from MVWT review, 28 Jul 04 ==
== Notes ==
* [[DARPA Grand Challenge Follow-On]]
 
=== Notes from MVWT review, 28 Jul 04 ===


Steve: prioritize what needs to get done this summer; leave enough time for documentation; think hard about latency.
Steve: prioritize what needs to get done this summer; leave enough time for documentation; think hard about latency.

Revision as of 23:45, 24 November 2005

Murray-redeye.gif

Richard M. Murray

Professor of Control and Dynamical Systems
Division of Engineering and Applied Science
California Institute of Technology




Papers Research Group Teaching Contact

Other Activities:

Private homepage Public homepage CDS 110b
IST / CMI

Projects

SysAdmin functions

Notes

Notes from MVWT review, 28 Jul 04

Steve: prioritize what needs to get done this summer; leave enough time for documentation; think hard about latency.

Lars: documentation is very important; pay a lot of attention to arrows on the interface charts; C2 API extensions to bats and Kellys - will probably need to consider commanding accelerations instead of velocities.

Claire: will be hard to get everything working at the end => start working on interfaces between the teams. Pair up people from different teams.

Jeff: positioning team presentation did a nice job giving motivation. Put the status chart at the end.

Bob: get in touch with Geir Dullerud at UIUC and look at their hovercraft. C2 group should also look at this - trade ideas with what they are doing. Position group - detecting orientation might be hard; differential GPS may not give you what you need. What's the fall back? Think about developing set of test trajectories for testing out controllers (flatness, etc).