CDS110a before a Field Test
From Murray Wiki
Jump to navigationJump to search
Before any field test, you should have several sets of gains that you plan to test (chances are, many of them won't work, so you want to be prepared). For each set, you should have run it in simulation, and shown me plots of the following:
- control signal vs. time
- error vs. time