CDS110a before a Field Test: Difference between revisions

From Murray Wiki
Jump to navigationJump to search
No edit summary
 
m (CDS110a Requirements before running on Alice moved to CDS110a before a Field Test)

Revision as of 21:07, 28 October 2006

Before any field test, you should have several sets of gains that you plan to test (chances are, many of them won't work, so you want to be prepared). For each set, you should have run it in simulation, and shown me plots of the following:

  1. control signal vs. time
  2. error vs. time