NIH P50: Difference between revisions

From Murray Wiki
Jump to navigationJump to search
Line 25: Line 25:
* Current owner: Richard
* Current owner: Richard
* Sent out for comment on 13 Nov
* Sent out for comment on 13 Nov
* Added paragraph from MBE in single cell imaging


==== Organizational structure/decision making plan (2 pages) ====
==== Organizational structure/decision making plan (2 pages) ====

Revision as of 06:00, 16 November 2006

Center for Biological Systems Architecture (CBSA)

Christina D. Smolke (PI)
Anand Asthagiri      David Baltimore      John Doyle      Michael Elowitz
Grant Jensen      Richard Murray      Dianne Newman      Rob Phillips

Goals

  • To develop a complete and predictive understanding of the control systems that are responsible for core processes of metabolism, polymerization, assembly and signal transduction in microorganisms
  • To apply the techniques developed through the study of individual cells to the complementary problems of communication modes and probabilistic decision processes in multi-cellular systems
  • To develop a complete and predictive understanding of the control systems that are responsible for regulating the processes directing how mammalian cells interact with their environment.

Timeline

  • 16-18 Nov: CDS out of town (online)
  • 19 Nov (Sun): Meet at 10 am in Steele

Proposal Outline

Program summary (5 pages)

  • Current owner: Richard
  • Sent out for comment on 13 Nov
  • Added paragraph from MBE in single cell imaging

Organizational structure/decision making plan (2 pages)

  • Current owner: Richard
  • Working on first iteration; sent to Christina then to group

Center development and outreach plans (5 pages)

  • Current owner: Richard
  • Sent out for comment

Research projects and preliminary studies (50 pages)

DBP #1
DBP #2
DBP #3
Experimental Platforms
Theory and Computation

Core facilities (2 pages)

Education and Training

  • Owner: Richard Murray
  • Initial version sent out for comment

Intellectual property plan (1 page)

Diversity (URM) plan (1 page)

Timeline (2 pages)