DGC75 Status Chart: Difference between revisions

From Murray Wiki
Jump to navigationJump to search
(=Design Specification=)
m (=Design Specification=)
Line 6: Line 6:
----
----
== Design Specification ==
== Design Specification ==
----
Don't currently have any formal way of specifying system requirements or propogating them through the design.  Need to think through how requirements will be specified at both project and team level.
Don't currently have any formal way of specifying system requirements or propogating them through the design.  Need to think through how requirements will be specified at both project and team level.


Line 13: Line 11:
* GOTChA chart: requirements should be reflected in objectives
* GOTChA chart: requirements should be reflected in objectives
* Design reviews: reviews should demonstrate requirements are met
* Design reviews: reviews should demonstrate requirements are met
----


== Project/Team Meetings ==
== Project/Team Meetings ==

Revision as of 20:41, 19 June 2004

Caltech Project Management Toolset (CPMT) Status Chart

Updated: 19 Jun 04

CPMT Status 2004-06-19.jpg

Design Specification

Don't currently have any formal way of specifying system requirements or propogating them through the design. Need to think through how requirements will be specified at both project and team level.

Interfaces:

  • GOTChA chart: requirements should be reflected in objectives
  • Design reviews: reviews should demonstrate requirements are met

Project/Team Meetings


GOTChA Chart


Status Chart


Timeline Chart


Design Reviews


Tests/Demos


Bugzilla Task Lists


Wiki Documentation