Control of Functional Bioenabled Materials using Synthetic Cells: Difference between revisions

From Murray Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 28: Line 28:
|Title=Control of Functional Bioenabled Materials using Synthetic Cells
|Title=Control of Functional Bioenabled Materials using Synthetic Cells
|Agency=ARO ICB
|Agency=ARO ICB
|Grant number=W911NF19D90001
|Grant number=W911NF-19-D-90001
|Start date=1 Aug 2023
|Start date=1 Aug 2023
|End date=31 Jul 2025
|End date=31 Jul 2025
Line 34: Line 34:
|Reporting requirements=Annual reports
|Reporting requirements=Annual reports
|Project ID=ICB biomaterial
|Project ID=ICB biomaterial
|ack=This research is supported by the Institute for Collaborative Biotechnologies through cooperative agreement W911NF19D90001 from the U.S. Army Research Office. The content of the information on this page does not necessarily reflect the position or the policy of the Government, and no official endorsement should be inferred.
|ack=This research is supported by the Institute for Collaborative Biotechnologies through contract W911NF-19-D-90001 from the U.S. Army Research Office. The content of the information on this page does not necessarily reflect the position or the policy of the Government, and no official endorsement should be inferred.
}}
}}

Revision as of 05:31, 11 December 2023

Place project description here. Use

Project description (typically about a paragraph)

Current participants:

Additional participants:

Collaborators:

Past participants:

Objectives

Description of the main objectives of the project

References

None to date

to insert the standard boilerplate information.



This research is supported by the Institute for Collaborative Biotechnologies through contract W911NF-19-D-90001 from the U.S. Army Research Office. The content of the information on this page does not necessarily reflect the position or the policy of the Government, and no official endorsement should be inferred.

  • Agency: ARO ICB
  • Grant number: W911NF-19-D-90001
  • Start date: 1 Aug 2023
  • End date: 31 Jul 2025
  • Support: 2 graduate students
  • Reporting: Annual reports