NIH P50: Difference between revisions

From Murray Wiki
Jump to navigationJump to search
 
(20 intermediate revisions by the same user not shown)
Line 9: Line 9:
{| width=100%
{| width=100%
|- valign=top
|- valign=top
| width=60% |
== Drafts ==
* Intro material + admin, training, etc (15 Nov 06, 10:30 pm): [[Media:nih06-systems.pdf|pdf]] (154K)
* DBP #1 - Core Processes in Micro-Organisms: [[Media:nih06-dbp1.doc|doc]] (3.0 MB), [[Media:nih06-dbp1.pdf|pdf]] (1.3MB)
* NIH: [http://grants.nih.gov/grants/guide/rfa-files/RFA-GM-07-004.html RFA], [http://grants.nih.gov/grants/funding/phs398/phs398.html PHS 398]
|
|
== Goals ==
* Experimental and theoretical tools for understanding the regulatory architecture of cells and multi-cellular systems
* Education of the next generation of systems biologists
* Application of new tools to driving applications


== Objectives ==
* CDS: A modular platform for detecting activation through signalling pathways using FRED-basted molecular sensors applied to mapK signalling pathways.
|
== Timeline ==
== Timeline ==
* 24 Oct, 3 pm: objectives + writing assignments
* 16-18 Nov: CDS out of town (online)
* 30 Oct-2 Nov: work on individual sections
* 19 Nov (Sun): Meet at 10 am in Steele
* 3 Nov (Fri): first cut at individual sections due
* 5 Nov (Sun): first draft of full proposal out
* 6-10 Nov: updates to individual sections
* 13 Nov (Mon): second cut at individual sections due
* 14-15 Nov: CDS writing
* 16-19 Nov: Grants.gov massaging
* 20-21 Nov: polishing
|}
|}


== Proposal Outline ==
== Proposal Outline ==


Program summary (2 pages)
==== Program summary (5 pages) ====
* Statement of goals and objectives (milestones)
* Current owner: Richard
* Build off of vision statement
* Sent out for comment on 13 Nov
* What makes us unique?  Bringing together three essential elements
* Added paragraph from MBE in single cell imaging
** Computational and theoretical infrastucture for pursuing regulatory architectures
 
** Unique experimental platforms
==== Organizational structure/decision making plan (2 pages) ====
** Unique ''combination'' of driving biological problems
* Current owner: Richard
* Move from small scale static to large scale, dynamic
* Working on first iteration; sent to Christina then to group
** Look across a class of biological applications
 
** Make use of theory and computational tools to guide experiments
==== Center development and outreach plans (5 pages) ====
** Spatial structure becomes important (primarily affects the dynamics of regulation)
* Current owner: Richard
* Sent out for comment
 
==== Research projects and preliminary studies (50 pages) ====
 
===== DBP #1 =====
 
===== DBP #2 =====
 
===== DBP #3 =====


Organizational structure/decision making plan (2 pages)
===== Experimental Platforms =====


Center development and outreach plans (5 p)
===== Theory and Computation =====


Resaerch projects and preliminary studies (30 p)
==== Core facilities (2 pages) ====


Core facilities (10 p)
==== Education and Training ====
* Owner: Richard Murray
* Initial version sent out for comment


Intellectual properly plan (1 page)
==== Intellectual property plan (1 page) ====


Diversity (URM) plan (2 pages)
==== Diversity (URM) plan (1 page) ====


Timeline (2 pages)
==== Timeline (2 pages) ====
* List of milestones for years 1, 2, 3 and 4-5


[[Category:Proposals]]
[[Category:Proposals]]

Latest revision as of 21:07, 19 November 2006

Center for Biological Systems Architecture (CBSA)

Christina D. Smolke (PI)
Anand Asthagiri      David Baltimore      John Doyle      Michael Elowitz
Grant Jensen      Richard Murray      Dianne Newman      Rob Phillips

Drafts

  • Intro material + admin, training, etc (15 Nov 06, 10:30 pm): pdf (154K)
  • DBP #1 - Core Processes in Micro-Organisms: doc (3.0 MB), pdf (1.3MB)
  • NIH: RFA, PHS 398

Timeline

  • 16-18 Nov: CDS out of town (online)
  • 19 Nov (Sun): Meet at 10 am in Steele

Proposal Outline

Program summary (5 pages)

  • Current owner: Richard
  • Sent out for comment on 13 Nov
  • Added paragraph from MBE in single cell imaging

Organizational structure/decision making plan (2 pages)

  • Current owner: Richard
  • Working on first iteration; sent to Christina then to group

Center development and outreach plans (5 pages)

  • Current owner: Richard
  • Sent out for comment

Research projects and preliminary studies (50 pages)

DBP #1
DBP #2
DBP #3
Experimental Platforms
Theory and Computation

Core facilities (2 pages)

Education and Training

  • Owner: Richard Murray
  • Initial version sent out for comment

Intellectual property plan (1 page)

Diversity (URM) plan (1 page)

Timeline (2 pages)